Electric Station
Adaptation of the electrical distribution system to the Electric Vehicle
The electrical energy to be consumed has to be transformed. As much as we increase generation through new wind farms and other power plants
… if we do not have enough Transformation Centers in the cities, we will not be able to bring the energy to the final consumers.
With a Power
maximum of 1,000 KVA, 20Kv / 400v
The Cetur is capable of supplying current to homes, buildings, urban lighting as well as the following elements.
Beacons 4G y 5G WIFI
Pantograph up to 150 Kw
VE fast charger up to 150 Kw
VE In-Line Chargers (7.4 – 22 – 43) Kw
Integrate 1 or 2 50 Kw chargers
Illuminated or video advertising screens

Quick Install
Assembly in 72 hours
To install CeTur, it takes about three day´s work and the tech-nical and human resources needed are one lorry crane, two operators and one supervisor









CeTur constitutes an efficient solution for offering up to 1000kVA in 3.5 m2 of footprint and with a quick return on your investment
The novelty of CeTur
SAFE
FAST
NICE
MULTIFUNCTIONAL
ROI

“The only real and innovative solution to install transformation centers in urban areas“
It will be a pleasure to inform you
Central Office
Sustainable Agenda 21
Visual impact reduction
Suppression of architectural barriers
Easy recycling and reuse
Pollution reduction